Surprisingly, two years into living here, this is my first post about our guest bathroom. It is the exact same layout as the main floor bathroom – it is even aligned exactly above the other bathroom in the floorplan. Soon after we moved in, we discovered that the drain in the tub leaked, so initially, I painted the walls and left everything else alone until we could have a plumber fix the drain. We finally got around to that back in October, and since then, I have worked on pulling the room together.
I prefer not having a separate shower curtain and liner, but the choices were slim for an extra long fabric liner, so I went with this navy striped curtain to play off the spare bedroom colors. The wall color is the same as a lot of the rest of the house – Gobi Desert by Behr color-matched at Sherwin Williams. The print hanging above the commode was a Groopdealz by Project Type. As in the master bathroom, I also used Dover White by Sherwin Williams on the vanity and added Martha Stewart finial pulls to the cabinet doors.
Renovating this bathroom is not a priority, so minor changes I would like to make in here include framing the existing mirror with moulding, adding a timer to the exhaust fan switch, and trying out a gray colored grout-shield on the large white hexagon floor tile.